The project comprises a pipework link between the two existing boiler rooms within Alma building to provide an element of redundancy should one of the existing boilers fail. A series of pumps and heat exchangers shall be installed to enable bi-directional backup of supply whilst maintaining hydraulic separation between the 2 existing building systems.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Envirotech Building Services | 07052083 | £160,234 | - |