East Ayrshire Council awarded this contract to Track Civil Enginineering Solutions after receiving 3 tenders. The contract value is £698,640.
An existing gabion wall, retaining a slope and footpath above, within Annick Water is in a deteriorated state. If no remediate works in the form of scour protection are undertaken, this may lead to a slope stability issue of the greater slope.
Ayrshire Roads Alliance (East Ayrshire Council), wish to prevent any further deterioration of this structure and prevent any slope stability issues from as a result of the failing wall. Thus interventional remediation measures are required to protect the bank and slope toe form further erosion.
Construction materials · Scotland · CPV 45111230, 44212410, 45233142
Contract signed on 7 Sept 2026. End date not specified.
3 tenders received. Open procedure.
Track Civil Enginineering Solutions Ltd