The objective of the works is to determine the construction and condition of the current bound road material at specified sites, and to determine the presence of any possible hazardous materials. The contract operates on a call off basis, determined by the client where need for coring is identified.
The contractor will also be required to provide a Waste Classification for materials at each locus tested.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 720 days (≈2 yrs) | - | active |