BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
HIAL is seeking the services of a suitably qualified Design and Build Specialist to undertake the detailed design, construction and installation of:
The supplier shall carry out a comprehensive lightning protection risk assessment for the proposed mast in accordance with BS EN 62305 standards. If, based on the assessment, the structure does not meet a tolerable risk level, the supplier shall design, supply and install an appropriate lightning protection system in accordance with the relevant standards to reduce the risk to a tolerable level.
The supplier will be responsible for the complete design, supply, installation, project management and commissioning of new lattice tower structures.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 | - | planned |