The existing terminal building at Tiree as reached the end of its' serviceable life' and is to be replaced with a new, modern building along with additional works to increase the capacity of the marshalling area and improve the footways and road surfacing. The port will remain operational throughout the construction period.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 450 days (≈1.2 yrs) | - | active |