Renfrewshire Council has appointed a single Contractor to undertake two contracts:
1. Phases 4 and 5 (contract reference RC-CPU-25-158)is for the construction of 1.4km of shared footway and cycleway from the end of the existing shared footway/cycleway on Greenock Road, round Red Smiddy Roundabout, north onto Southbar Road to Southholm Roundabout. There is an existing footway at Red Smiddy Roundabout which is widened, and new construction on Southbar Road. In places the existing carriageway is widened.
2. Phase 6 (contract reference RC-CPU-25-159) is for the construction of 0.616km of shared footway and cycleway from Southholm Roundabout to the overbridge on the A726 on the northbound verge. This will include the relocation of street lighting columns, road signs and installation of new drainage. The works will involve the construction of a ramp to create a connection to the existing footway overbridge over the A726.
The Council has awarded both contracts for this project to one Contractor.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| John McGeady Ltd | SC080553 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 8 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 180 days | £1,056,775 initial term | 8 | John McGeady Ltd | complete |
Published by the buyer on this notice. Check the original notice — details change and are not updated here.