New Footway and buildouts:
The existing footway is to be extended, a new footway is to be installed to provide pedestrian facilities between parking areas. Additionally, buildouts and new pedestrian crossing points are to be installed.
Installation of new signage and removal of existing signage:
Some existing traffic signage is to be removed and new speed limit roundels, directional signage and hazard warning signage is to be installed.
** Road Markings: Some existing road markings are to be removed and new road markings are to be installed.
** Installation of new pedestrian guardrail and road humps:
The existing post and bollard cordon adjacent to the terminal building is to be removed and a new pedestrian guardrail is to be installed. Additional bolt-down road humps are to be installed on the approaches to several pedestrian crossing points.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Mackenzie Construction Ltd | SC073177 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 4 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | £119,000 initial term | 4 | Mackenzie Construction Ltd | complete |