BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The buildings are made up of timber huts with a link corridor connecting into the main school. The buildings have a timber frame construction supported on a single 100mm leaf of substructure concrete blockwork around the perimeter of the buildings and cross walls at approx. 1750mm centres internally to support the floor joists. External walls have timber cladding and metal sheet cladding to the roofs. Steel framing was subsequently installed to deal with roof uplift loads, which are supported on concrete pad foundations.
The classroom and link have an approximate area of 418m2.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| George Beattie & Sons Ltd | SC122379 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 3 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 60 days | £88,566 initial term | 3 | George Beattie & Sons Ltd | complete |