The Gremista Landfill, Lerwick Phase 3 extension will primarily involve cut and fill earthworks, new haul roads, installing new surface water drainage ditches, pipework, manholes, and headwalls; placing a 500mm bentonite-enriched soil layer over the new landfill formation surface; followed by a 2mm HDPE welded geomembrane basal liner, protection geotextile, leachate collection pipework, and 500mm thick, clean aggregate drainage / protection layer. Capping works to the existing Phase 2 landfill area are also included and will comprise 1mm thick LLDPE welded geomembrane and restoration soils.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 720 days (≈2 yrs) | - | active |
Weightings from the notice.
Published by the buyer on this notice. Check the original notice — details change and are not updated here.