The works comprise of forming a new fire exit to the existing school gymnasium at Muirfield Primary School. The works will include the formation of the new door openings, inserting new lintels over opening, installing new double door set, construction of new concrete platt and all associated works as per the drawings and specification provided. The main contractor will be responsible for design, installation, maintenance and removal of all temporary works, shoring, propping and bracing as required to carry out the works in a methodical, controlled and safe manner.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Alpha Projects | - | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 1 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | £30,730 initial term | 1 single bid — no competition | Alpha Projects | complete |