Perth & Kinross Council (‘the Council’) were seeking to appoint suitably qualified and experienced Contractor to carry out gabion wall repairs and scour protection at A827 Bolfracks. The Bolfracks wall is an existing gabion basket retaining wall supporting the A827 between Aberfeldy and Kenmore. The River Tay is at the foot of the wall. The foundations of a 20m long section of wall have been scoured away by the river and have partially collapsed. The works are to remove and replace this failed section of wall and install rockbag scour protection to the full length of the wall. The site has high environmental importance. The A827 road is a key route in the area and road closure duration must be minimised.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| MAM Contracting | - | ~£500,000 estimated from lot values | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 6 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 390 days (≈1.1 yrs) | £500,000 £439,211 initial term | 6 | MAM Contracting | complete |