It is proposed to remove the existing interceptor and its 2 No. access manholes and replace with a full retention separator which is fully compliant with current regulations and reuse/reworking of some of the existing pipework including construction of 1 No. new manhole upstream of the separator to allow future isolation for maintenance and 1 No. new access manhole over the new separator 2 No. access chambers. Installation of duck billed and flap valves downstream of the separator are intended to prevent the backflow of seawater into the separator.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Alchemy Plant & Contracting Ltd | SC392776 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 2 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 180 days | £109,810 initial term | 2 | Alchemy Plant & Contracting Ltd | complete |