BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
It is proposed to remove the existing interceptor and its 2 No. access manholes and replace with a full retention separator which is fully compliant with current regulations and reuse/reworking of some of the existing pipework including construction of 1 No. new manhole upstream of the separator to allow future isolation for maintenance and 1 No. new access manhole over the new separator 2 No. access chambers. Installation of duck billed and flap valves downstream of the separator are intended to prevent the backflow of seawater into the separator
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 180 days | - | active |
Published by the buyer on this notice. Check the original notice — details change and are not updated here.