The contracts are for urgent repairs and jobbing works to Angus Council properties (excluding council housing).
The contracts cover a range of trades with individual orders for works which are of an urgent repair, minor alteration or maintenance in nature being placed with the appropriate appointed contractors. The contracts will run from the 1 April 2025 to 31 March 2029.
Contractors will be appointed on a trade and area basis and where possible standby contractor(s) will be put in place. The maximum value of any one order is restricted to GBP 50 000.
Details as to the procedure for awarding work to contractors selected to the frameworks for each lot during the contract will be set out in the tender documentation. Provision will also be made to appoint a contractor(s)from other lots where a deficiency of contractors arises in a given trade category (lot) during the course of the contract.
No supplier information available.
This procurement was divided into 32 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Asbestos Removal - Angus Wide 1,440 days (≈3.9 yrs) | - | active |
| Lot 3 Builder Work - Arbroath, Brechin and Montrose 1,440 days (≈3.9 yrs) | - | active |
| Lot 2 Builder Work - Kirriemuir, Forfar, Monifieth and Carnoustie 1,440 days (≈3.9 yrs) | - | active |
| Lot 4 Demolition Work - Angus Wide 1,440 days (≈3.9 yrs) | - | active |
| Lot 5 Drain Jetting Work - Angus Wide 1,440 days (≈3.9 yrs) | - | active |
| Lot 6 Electrical Work - Kirriemuir and Forfar 1,440 days (≈3.9 yrs) | - | active |
| Lot 7 Electrical Work - Monifieth and Carnoustie 1,440 days (≈3.9 yrs) | - | active |
| Lot 8 Electrical Work - Arbroath 1,440 days (≈3.9 yrs) | - | active |
| Lot 9 Electrical Work - Brechin and Montrose 1,440 days (≈3.9 yrs) | - | active |
| Lot 10 Felt Roofing, Metal Sheet Roofing, Single Ply Roofing - Angus Wide 1,440 days (≈3.9 yrs) | - | active |
| Lot 11 Fencing Work - Angus wide 1,440 days (≈3.9 yrs) | - | active |
| Lot 12 Flooring Work - Kirriemuir, Forfar, Monifieth and Carnoustie 1,440 days (≈3.9 yrs) | - | active |
| Lot 13 Flooring Work - Arbroath, Brechin and Montrose 1,440 days (≈3.9 yrs) | - | active |
| Lot 14 Glazier Work - Angus Wide 1,440 days (≈3.9 yrs) | - | active |
| Lot 15 Heating and Ventilation Work - Kirriemuir, Forfar, Monifieth and Carnoustie 1,440 days (≈3.9 yrs) | - | active |
| Lot 16 Heating and Ventilation Work - Arbroath, Brechin and Montrose 1,440 days (≈3.9 yrs) | - | active |
| Lot 17 Joiner Work - Kirriemuir and Forfar 1,440 days (≈3.9 yrs) | - | active |
| Lot 18 Joiner Work - Monifieth and Carnoustie 1,440 days (≈3.9 yrs) | - | active |
| Lot 19 Joiner Work - Arbroath 1,440 days (≈3.9 yrs) | - | active |
| Lot 20 Joiner Work - Brechin and Montrose 1,440 days (≈3.9 yrs) | - | active |
| Lot 21 Painter Work - Kirriemuir, Forfar, Monifieth and Carnoustie 1,440 days (≈3.9 yrs) | - | active |
| Lot 22 Painter Work - Arbroath, Brechin and Montrose 1,440 days (≈3.9 yrs) | - | active |
| Lot 23 Pest Control - Angus Wide 1,440 days (≈3.9 yrs) | - | active |
| Lot 24 Plumbing Work - Kirriemuir, Forfar, Monifieth and Carnoustie 1,440 days (≈3.9 yrs) | - | active |
| Lot 25 Plumbing Work - Arbroath 1,440 days (≈3.9 yrs) | - | active |
| Lot 26 Plumbing Work - Brechin and Montrose 1,440 days (≈3.9 yrs) | - | active |
| Lot 27 Slater and Roof Tile Work - Angus Wide 1,440 days (≈3.9 yrs) | - | active |
| Lot 28 Smith Work - Angus Wide 1,440 days (≈3.9 yrs) | - | active |
| Lot 29 Swimming Pool Repair Work - Angus Wide 1,440 days (≈3.9 yrs) | - | active |
| Lot 30 Tarmacadam Work - Angus Wide 1,440 days (≈3.9 yrs) | - | active |
Published by the buyer on this notice. Check the original notice — details change and are not updated here.