The Purchaser requires Steam Boilers 3 & 4 to be replaced, together with their associated plant and equipment. The project shall include for safe isolation, disconnection, dismantling, removal and disposal off-site of the existing boilers and associated plant and any required modifications to the existing boiler room and associated services.
The replacement is to be carried out in a manner in which a continuous supply of steam is maintained to the Establishment at all times, unless agreed in advance with the Employer's PM and the Establishment.
The existing boilers are Cochran Wee Chieftain boilers with dual fuel (gas/oil) burners complete with gas boosters. Each boiler has a dedicated free- standing self-supported flue, which is routed through the roof. Associated plant includes hot-well tank/feed water tank, blow down vessel, dosing system and controls.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| James Ramsay (Glasgow) Ltd | SC011277 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 1 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 Jan 2025 – Feb 2025 | £798,759 initial term | 1 single bid — no competition | James Ramsay (Glasgow) Ltd | complete |