BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The Former Polquhirter Treatment Works River Corridor Restoration project is for the construction of the detailed design as provided in this tender.
The works include the removal of the embankments running through the Former Polquhirter Treatment Works and construction of new embankments at an appropriate setback distance to satisfy the flood alleviation and river restoration measures specified. The works include re-profiling of the ground between the river and embankments, which requires re-turfed, seeded and planted as per an agreed design. The works include the construction of a new culvert, headwalls and sluice gate are to be installed in the Castlemains Field Drain/Burn, with remeandering downstream of the new culvert.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 90 days | - | active |
Published by the buyer on this notice. Check the original notice — details change and are not updated here.