The works comprise the removal of existing glazed curtain walling, windows and external doors and their replacement with new into the existing structural openings. Existing steel mullions, columns and transoms are to be retained. The works include new window ingoes, cills and heads; new curtains and blinds; alterations to ventilation ductwork with new plenums and connections to the new curtain walling louvres; the removal and reinstatement of suspended ceilings to allow access to the ductwork; the removal and replacement of two existing external water stand pipe taps with new; associated works to the existing door security contacts. The Contractor is also responsible for any scaffold or access platform design including the structural integrity of any existing floors or external ground that the scaffold may be built up off. Tullos School is Category B Listed.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Alpha Projects | - | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 3 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | £323,308 initial term | 3 | Alpha Projects | complete |