To undertake approx. 300 ha of peatland restoration (over 14 km of hag reprofiling, 28 km of drain blocking, and installation of 125 peat dams to prevent further erosion in some gullies and bare peat areas.)
NOTE: this site is split into 2 areas and quotes are sought for either or both of these areas.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 | - | planned |