Argyll and Bute Council require a contractor to carry out a bridge maintenance scheme on B840-140 Ardchonnel Bridge whilst ensuring the B840 remains open to vehicular and pedestrian traffic.
The scheme comprises of a variety of disciplines including reinforced concrete works for a new buttress wall, reinforced concrete beam, reinforced concrete parapet and drainage which have been designed to prolong the life of the structure.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Green Cat Contracting Ltd | SC440538 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 2 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | £70,000 initial term | 2 | Green Cat Contracting Ltd | complete |