BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The works to 22Nr Falkirk Council properties comprise:
1.The upgrade of existing Coster Control systems to Trend Controls, including the replacement of the BMS controllers at each location, with Trend Controllers, upgrade of sensors, integration of these systems and properties into the IQ Vision platform, upgrades/ re-programming of system software, provision of alarms and trend graphs for nominated services, provision of time schedules in accordance with FC requirements and the provision of graphics for each property in accordance with FC’s standards.
2.The replacement of the remaining standalone controls packages with Trend Controls provision, existing packages extend to Priva, Siemens, Stafea etc, the provision of control new panels with separate power and control sections, new Trend BMS controllers, upgrade of sensors, upgrade and replacement of peripheral devices, the integration of these systems and properties into the IQ Vision platform, new system software, provision of alarms and trend graphs for nominated services, provision of time schedules in accordance with FC requirements and the provision of graphics for each property in accordance with FC’s standards.
3.Replacement/alteration/reconnection of existing services ie heating, electrical, and domestic hot water controls as detailed within the project particulars.
4.Re-use of the existing power cabling including reconnection and testing.
5.Connections between the FC IT network and new control panels. Note new outlet dats points provided by RC.
6.Works to controls and panels as per FC standard BeMS Controls Performance Specification.
7.Seasonal commissioning as per FC standard BeMS Controls Performance Specification.
8.Builderswork
Making good areas where equipment removed.
9.Operating and Maintenance information for the works.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 180 days | - | active |
Published by the buyer on this notice. Check the original notice — details change and are not updated here.