North Ayrshire Council aim to develop a 7.48MW solar PV farm on the former Nethermains landfill site. A grid connection will be required for Nethermains Solar PV Farm.
A grid connection can only be set up by a Distribution Network Operator (DNO). The distribution network operator is responsible for the maintenance and operation of the electric and gas networks up and down the country and in Scotland, unlike England, there is only one DNO. Scottish Power Energy Network (SPEN) are the sole DNO and the only one who can provide a quote to establish a gird connection.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Scottish Power Energy Network Holdings | - | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 1 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | £487,730 initial term | 1 single bid — no competition | Scottish Power Energy Network Holdings | complete |