CPI have a requirement to create two usable areas from a redundant transformer room at the Neville Hamlin Building facility, Sedgefield. The redundant transformer has been removed and the room is now empty. The plan is to use the room as a storage area (1st Floor) and a workshop area (Ground Floor). The proposal is to utilise this space, which is currently open from floor to ceiling height, to create 2 useable areas. The ground floor to be used as a workshop area and the first floor (following the installation of a mezzanine structure and other works) to be used as a spare’s storage area. The works will involve supply and installation of a mezzanine floor, structural works including installation of a door opening, electrical works, fire detection, joinery to existing doors and application to local council for building regs compliance. Please refer to the tender pack for further detail and information relating to this requirement.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| NSI Projects | - | ~£50,000 estimated from lot values | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 1 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 180 days | £50,000 £85,686 initial term | 1 single bid — no competition | NSI Projects | complete |