The Net Zero Technology Centre are providing support to B9 in the concept engineering in Phase 1. The battery limits associated with this engineering support are the specification and sourcing of the GT considering the main consumers and associated interfaces on-site (electrolyser, compression, storage) as well as the design of the blending panel to utilise grid gas and hydrogen as fuel gas for the GT.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Apollo | Charity Commission: 1197355 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 3 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | £41,190 initial term | 3 | Apollo | complete |