BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
As a Subsurface operation Glasgow Subway experiences water ingress into its Tunnels system that is managed by a water pumping system that consists of 21 separate Sump locations and 43 Pump sets spread across the Subway infrastructure. Installed within these Sumps are either 2 or 3 Pumps sets, dependent on the water flow that is managed at that location. All pump sets operate on Duty/Standby configuration with the duty alternating between each pump. The Sump Pump starter control arrangements have been installed in a ‘Direct on Line’ (DOL) configuration that is both energy inefficient and produces a high mechanical shock on the pump set itself.
SPT wishes to upgrade and modernise a number of these Pump sets to utilise Variable Speed Drive (VSD) Technology and to bring with it benefits of less mechanical wear through a ramped start up operation and also look to reduce where possible the speed of the pumps to harness Energy and Carbon emission reduction.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| EDC (Scotland) Ltd | SC167935 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 1 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | £200,000 initial term | 1 single bid — no competition | EDC (Scotland) Ltd | complete |