South Lanarkshire Council’s Community and Enterprise Resources, Economic Development, identified a requirement to appoint a specialist consultant. The consultant will require to complete a detailed review on the areas listed below:
-All National / Regional and Local policy and town centre relevant guidance (including Place Principle)
-Place Assessment and design / heritage and contextual appraisal for each town centre.
-Complete a Precedent and Benchmarking town centres study with Case Examples and Lessons Learnt based on European/UK/Scottish benchmarks and urban planning – net zero transition.
-Integrate emerging Data Analysis (separate commission /study strand) providing detailed contextual understanding of the functionality / socio-economic baseline for the differing centres and town
-Complete a series of SWOT assessments or similar of the problems/challenges, opportunities / threats facing the 3 tiers and individual town settlements
-Complete a Place – Town Centre Trends study to identify the evidence base for change with specialist papers /key trends identified. Tenderers should set out in summary the key methodology for this area of assessment in their submission.
-Facilitate and manage Workshops with the Council’s Economic /Planning /regeneration Teams and other stakeholder interests to develop the strategic place understandings and inform / complete the assessment of future challenges
-Complete a detailed Planning Policy Review as it affects the Council ambitions (live /work /learn /invest/visit/etc) for each individual Town Centre, reviewing the requirements for new, -specific policies (Net Zero / 20 Min Neighbourhoods / Place principle / etc) that will address the needs of individual centres.
The review is required to develop a detailed town centre visioning across SLC’s hierarchy and mechanisms to address change creating a Place Regeneration Framework that supports adaptation and change.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Ironside Farrar Limited | SC109330 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 1 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | £96,000 initial term | 1 single bid — no competition | Ironside Farrar Limited | complete |
Government spending data: This supplier has received £54,384 in 2 payments (over £25k) from Scottish Government (2019-03-22 to 2025-02-20). View full payment history →