Shougle Bridge carries the U118E unclassified road over Shougle Burn. Moray Council has a statutory obligation to maintain the Public Road Network, of which Shougle Bridge is a critical structure. The bridge provides sole access to Glenlatterach, including multiple dwellings, Glenlatterach Water Treatment Works and Glenlatterach Farm. There is no other Public Road access to Glenlatterach.
Gradual deterioration has led to outwards movement of the side walls and cracking due to overloading of the arch barrel. As the bridge provides sole access, sudden closure of the bridge would be unacceptable. The works proposed aims to remediate the deterioration and provide additional strengthening. This will involve rebuilding the deformed side walls and replacing the fill material over the arch with concrete to strengthen both the arch barrel and side walls, protecting against future deterioration.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Pat Munro (Alness) Ltd | SC033294 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 3 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | £465,810 initial term | 3 | Pat Munro (Alness) Ltd | complete |
Government spending data: This supplier has received £2,631 in 2 payments (over £25k) from Department for Transport (2013-07-01 to 2013-07-01). View full payment history →