The works comprise of the demolition of the Existing Lockup Garages, concrete floor slabs/foundations and all associated works including the removal from site of all debris.
The works also include the upfill of existing voids left by demolition and the import of a minimum of 300mm deep clean topsoil to be at the same level as adjacent ground level.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Central Demolition Ltd | SC172244 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 6 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | £35,333 initial term | 6 | Central Demolition Ltd | complete |