The SPS requires a Contractor to design, supply and install a replacement louvre at high level, complete with bird mesh. Materials and components shall be suitable for an exposed high saline environment. SPS expects the Works to be completed by 4th March 2022 prior to the 2021/22 Financial Year end, and therefore does not envisage a Contract duration exceeding 2 months.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| SKYFORM (SCOTLAND) LTD | SC165115 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 2 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | £52,955 initial term | 2 | SKYFORM (SCOTLAND) LTD | complete |