The objective of the project is to refurbish the Shaky Bridge that crosses the River Lednock approximately 2km north of the village of Comrie. The bridge has twin steel primary beams and a timber deck. The span of the bridge is approximately 25m.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 | - | planned |