The SPS currently has a requirement for a mechanical ventilation upgrade within the Central Stores building located in Fauldhouse. The SPS requires a contractor to design, supply and install enhanced mechanical ventilation within the Training Room and Kit Store.
A new DX coil will be installed to provide a primary heat source to the ventilation plant.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 | - | planned |