The Council has an ongoing requirement to appoint a single source Contractor for the Installation of Street Lighting columns, cables and associated equipment for use by South Lanarkshire Council Roads and Transportation Services.
There is a need to ensure continuity of provision through formal contracting that provides the Council with a fit for purpose service in line with current standards and legislation.
The works will include, installation of columns and LED's, ducting, cables, trenching and reinstatement of trenches, electrical inspection and testing throughout the boundary of South Lanarkshire.
The contract is the NEC3 Term Service Short Contract (2013).
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Lightways (Contractors) Limited | SC064413 | ~£1,750,000 estimated from lot values | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 3 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 1,440 days (≈3.9 yrs) | £1,750,000 | 3 | Lightways (Contractors) Limited | complete |
Published by the buyer on this notice. Check the original notice — details change and are not updated here.