BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Loading contract…
Lift Replacement and Assoc. Works in 5No. Tower Blocks, North Lanarkshire; Phase 2 | UKGovscan
Loading contract…
UNKNOWNProcurement notice · North Lanarkshire CouncilRef ocds-r6ebe6-0000632629
Lift Replacement and Assoc. Works in 5No. Tower Blocks, North Lanarkshire; Phase 2
The outline scope of works generally includes, but is not limited to;
The works will consist of the complete removal and subsequent renewal of the existing lifts and all associated works contained within Specification of Works
There is an option to retain and overhaul the car guides, counterweight, car sling and safety gear, in accordance with the specification. This is subject to the equipment being in a good serviceable condition with no visible defects and the retention not affecting the overall CE certification of the unit on completion. No other components will be retained.
The design, supply, installation and testing of new installations fully conforming and certified to EN81-21 lifts in accordance with the enclosed specification.
All equipment used must be in accordance with the specification and must remain consistent across all blocks.
Undertake all associated building works, alterations and making good in connection with the removal of the existing units and installation of the new lifts.
Undertake all associated electrical works and alterations in connection with the removal of the existing units and installation of the new lifts. Liaising and managing residents within domestic properties during installation works.
Provision of design calculations and drawings for checking prior to construction by the EA.
Provision of working / installation drawings.
Provision of record documents and as-fitted drawings.
Provision of training for the Clients maintenance staff and SFRS.
All works must comply with current Water Byelaws and Building Regulations