Renfrewshire Council has appointed a contractor to undertake the removal of the existing central median to provide an additional northbound right turn only lane at the junction of Renfrew Road and Netherhill Road in Paisley. To accommodate this, the existing carriageway is to be realigned and widened into the eastern footway. Amendments to the existing drainage are also required. At the junction of Renfrew Road / Netherhill Road, a full refurbishment of the existing Traffic Signals will be undertaken and, to improve the pedestrian facilities throughout the junction, the existing traffic islands are to be removed and reconstructed to provide wider crossing facilities. Elements of ducting are required to support the refurbishment of the Traffic Signals whilst also ensuring that SCOOT technology is continued throughout the Renfrewshire network
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Hillhouse Quarry Group Ltd T/A MacASPHALT | - | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 3 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | £292,428 initial term | 3 | Hillhouse Quarry Group Ltd T/A MacASPHALT | complete |