Construction of a 60m long, 2 span, steel and concrete composite bridge (ladder deck construction), including contractor designed piles, to replace the existing 4 span reinforced concrete structure. Construct temporary offline diversion (including temporary bridge). Demolition of existing structure.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 360 days | £3,250,000 | active |