BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Dear Supplier,We are inviting quotes for: Road W12 in Wauchope forest requires the 1750m to be ditch, scraping and outside edge, overhanging branches to be removed and approx. 400m of spot patching with culvert installation and W11 require 1800 ditc scrape and outside edge with removal of overhanging branches the installation of harvest facilities and culverts construction of T Piece and resurfacing the first 700m of the road, works will include the stripping, winning and production of the road stone required (12,000t) 63mm down. The supply and installation of all culverts and cut off pipes, construction of harvesting facilities. The quarry will require stipping casting back and landscape the spoil in the open area at back on top crest, further information will be discussed with the appointed contract at the Precoms meeting on Monday 27th April 2020 on site.Thanks
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Scott Young and Sons Ltd | SC335766 | £37,183 | - |