Dear supplier,We are inviting quotes for Harvesting ramps that are required off the top side and lower side of the recently constructed new forest road at Cairnhead, Upper Nithsdale. The works will involve excavation into the hillside and excavation into the lower spoil berm to form cut and fill ramps. The ramps, numbering 10 in total, will vary in length from 10 - 20m, and are to be stoned up with as-blasted stone uplifted from FLS Cairnhead quarry.Thanks
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| GTR Contracts Ltd | SC310883 | £5,268 | - |