The existing Drum structure removed and replaced with a new steel framed structure with new lighting. Podium, ramp and steps created below with new sandstone paving surface and lighting, re-used granite forming surround walls with metal balustrading to ramp and incorporating new curved toughened laminated etched glazed screen and metal resting bar. (3 nr.) existing granite planters removed from surrounding landscaped area with granite being utilized to form the new drum podium walls. Planter areas replaced with re-used granite paving from existing drum surfacing area with new tree grilles, kerbing, etc. with street furniture comprising feature granite benches with toughened and laminated glass backing. The lighting works also includes (3 nr.) new lighting columns and refurbishment of existing column lights, bollard lights and uplighters.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| KW Contractors Ltd | SC265471 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 2 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | £286,277 initial term | 2 | KW Contractors Ltd | complete |