Design, fabricate and install a system to monitor the movement of identified half-joints in a concrete bridge. Data should be live streamed and collated for analysis, to aid in the whole life management and maintenance of the bridge. The system should be able to track longitudinal and transverse movement along with vertical displacements. The system should also be able to monitor identified re-entrant cracks for deterioration. The system will include monitoring and annual reporting of the findings for a minimum of 6 years.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 | - | planned |