BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Aim - Refurbishment upgrade of existing shower rooms within the Bruce & Wallace Wings at Castle Huntly.
Objective - Upgrade the four section shower facilities with a design that fully meets building regulations and reduces future repair and maintenance requirements. A solution similar to a recent refit of two other areas of shower accommodation which utilised GRP mini PODS with a guarantee period of 25 years is proposed.
Background - The existing shower facilities within the section areas of Bruce & Wallace Wings require upgrading to minimise future repair and maintenance costs. There are four shower areas to be refurbished, each consisting of two shower cubicles and one wash hand basin. Flooring is concrete with existing drainage and each shower cubicle raised on a timber plinth (minus one area within Bruce wing). The floor area of each facility measures approximately 7m squared.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 | - | planned |