The objective of this ITT is to appoint a contractor to modify and expand an existing energy management system and high voltage electrical infrastructure, installed at an existing EMEC site. The energy management system must control the power generation and demand at site as an export limiting scheme, with the aim of minimising curtailment and maximising the energy captured by the connected renewable generators.
The modifications involve the integration of an additional hydrogen electrolyser and the expansion of the associated energy management system and high voltage electrical infrastructure. Modification will be required to both the electrical infrastructure, but also to the associated control system and associated hardware.
Civil works are required to facilitate the placement of the additional hydrogen electrolyser which would involve the connection of control and power cabling around the site.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 90 days | - | active |
Changes the buyer published to this notice after it first appeared.
Due to internal commitments this date has been extended.
Published by the buyer on this notice. Check the original notice — details change and are not updated here.