North Muirton Reservoir forms part of the Perth Flood Prevention Scheme (PFPS). In January 2016, on the only occasion when water levels in the River Tay have been high enough to bring the reservoir into operation, flooding was experienced in the Bute Drive area. Subsequent investigations have concluded that this flooding was due to seepage under the southern embankment. One element of this project is to install a seepage cut-off wall (sheet piles) to prevent a reoccurrence of this issue. An inspection also found that the outfall/headwall structure on the River Tay has been undermined and is in need of reconstruction.The second element of this project is to undertake this remedial and erosion protection work on the Headwall/outfall.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| RJ McLeod (Contractors) Ltd | SC028565 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 9 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | £834,914 initial term | 9 | RJ McLeod (Contractors) Ltd | complete |
Government spending data: This supplier has received £2,736,145 in 12 payments (over £25k) from Department for Transport (2014-05-09 to 2016-04-12). View full payment history →