The works comprise ground investigation works consisting of: Approx. 11. cable percussive boreholes, all expected to extend to depths of between 30m bgl and 40m bgl. Within the cable percussive boreholes approx. 3 soil cored follow-on boreholes (wireline drilling) (advanced from the base of the cable percussive boreholes) – 2 expected to extend to depths between 40m bgl and 60m bgl, and 1 expected to extend to a depth of 70m bgl. Within the cable percussive boreholes approx. 11. rotary cored follow-on boreholes (advanced from the base of cable percussive / soil cored holes) – 1. to recover 6m of core, and 10 to recover 30m of core (expected to extend to depths ranging between 36m bgl and 100m bgl).Approx. 3 CPTs – 2 expected to extend to depths of 35m bgl, and 1. expected to extend to a depth of 65m bgl. Approx. 5 No. trial pits to 3.0m depth.
All works will be undertaken in close proximity to a watercourse.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Causeway Geotech Ltd | NI610766 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 5 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | £327,980 initial term | 5 | Causeway Geotech Ltd | complete |
Government spending data: This supplier has received £112,907 in 2 payments (over £25k) from Welsh Government (2024-08-20 to 2024-09-11). View full payment history →