The Council, as Statutory Harbour Authority has a requirement for the supply of one tug boat and/or design and build of up to two new tug boats which meet the Council’s specification, which are required to provide a safe and reliable towage service in the Scapa Flow (including Flotta Oil Terminal) and Kirkwall harbour areas and elsewhere.The existing fleet of three (3) tug boats (built 1989 and 1992) requires to be replaced as part of a planned programme in order to provide towage to the Flotta Oil Terminal, Scapa Flow and Kirkwall and to meet increasing demands and specification requirements within and beyond Orkney for towage. With a modern design vessel it is expected that greater operational safety margins, flexibility and efficiencies will be achieved.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Sanmar Denizcilik Mak. ve Tic. A.S. | - | - | 1 lot Supply of Two New Towage Boats (Design and Build) | - |
This procurement was divided into 2 lots, each awarded separately. 4 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 Supply of One New Tug Boat | - | - | - | unsuccessful |
| Lot 2 Supply of Two New Towage Boats (Design and Build) | £12,200,000 initial term | 4 | Sanmar Denizcilik Mak. ve Tic. A.S. | complete |