The Glan Clwyd Hospital site has a strategic plan for future development and reduction of carbon usage through the implementation of refurbishments, new developments, and net-zero carbon technologies. To enable the provision of the site developments and low carbon technologies, significant upgrades to the electrical power infrastructure are required, this includes additional capacity from the distribution network operator (DNO), and new private site infrastructure.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 240 days | - | active |