BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Marubeni Europower Ltd is developing a green hydrogen production facility (called HyBont) drawing on new local solar PV and wind generation via private wire and sleeving. It is proposed this will supply multiple offtakers including a heat network serving Bridgend County Borough Council (BCBC) owned buildings, specifically a primary school, college, and leisure centre complex approximately 1.2km away. Buro Happold produced a feasibility study in 2022 which identified the preferred solution to be that the heat network will draw green hydrogen and waste heat directly from the electrolyser to serve the heat network. Waste heat recovered from the electrolyser will be used to meet the baseload heat demand on the heat network with hydrogen boilers providing top-up heat during peak times and when waste heat is not available, due to the intermittency of renewable energy supply to electrolyser. This innovative project will fully decarbonise the heating of these buildings and make use of a heat source that would otherwise be considered waste and lost. BCBC has been awarded funding from the Heat Network Development Unit (HNDU) to undertake the Detailed Project Development (DPD) phase study to determine whether the heat network opportunity is sufficiently viable to take through to commercialisation and delivery.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Aug 2023 – Feb 2024 | £185,000 | active |
Changes the buyer published to this notice after it first appeared.
Several Bidders requested additional time to make their returns. The dates following the amended Tender Return date are indicative and reflect a 2-week adjustment to the right.
Published by the buyer on this notice. Check the original notice — details change and are not updated here.