Tameside Metropolitan Borough Council awarded this contract to Waterman Infrastructure & Environment. It runs for 6 months from 1 Oct 2026. The contract value is £93,858.
To provide 11 Bridge Assessments and 20 Principal Bridge Inspections for 21 highway structures (bridges, footbridges, culverts). All inspections are to be carried out in accordance with the following:
a.)Department of Transport's Standards and Associated Documents CS450.
b.)This Contract and the Conditions of Contract
The inspections shall comprise of a close examination, within touching distance of all accessible parts of each structure, to provide information on the physical condition of all accessible parts of the highway structures.
North West
In delivery for 1 month. The contract ends on 31 Mar 2027.
Below threshold - limited competition.
Waterman Infrastructure & Environment Limited03269195