Zero-Capex Solar PV & Battery EnergyStorage System (BESS) Energy-as-a-Service Project… | UKGovscan
The buyer wants to talk to suppliers before designing the procurement. Taking part is how to shape it.
Description
Service Aims
The Trust aims to ensure the existing on-site energy centre is used as efficiently and effectively as possible in a manner that reduces energy costs and carbon emissions. The Trust is therefore seeking to install a battery storage and solar PV solution at Wansbeck General Hospital with the following requirements:
A containerised, modular system fort he Battery Storage capable of relocation and expansion, if required.
A cost model whereby the Trust makes no capital investment and pays no ongoing servicing/operational costs and the Trust is paid a fixed percentage of the savings or a flat annual fee.
Integration with the Trust’s HV network and any future renewables.
Measurement and verification services to demonstrate performance of the installed solution and the associated savings achieved.
How to bid
Preliminary market engagement notice (UK2). The buyer wants to talk to suppliers before designing the procurement. Taking part is how to shape it.