BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
To produce Stage 1, Stage 2 and ultimately Stage 3 Road Safety Audits which are a requirement of new works/schemes on the Highway. A Stage 1 RSA is required at the Preliminary design stage, a Stage 2 RSA at the Detailed design stage and at Stage 3 RSA on completion of the works. As several of these schemes are fairly simple, the RSA1 and RSA2 can be carried out together, thereby reducing time and cost.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| BWB Consulting Ltd | Procurement ID: PLND-8587-XCXY | £83,333 | 1 lot Lot 1 | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 | £83,333 initial term | BWB Consulting Ltd | active |