BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The existing boilers have reached the end of their serviceable life and require replacement before the start of the cold weather in 2026.
The proposed works comprise the refurbishment and replacement of existing gas-fired boiler plant within two existing plantrooms serving The Beeches Primary School, Beech Avenue, Peterborough, PE1 2EH.
The existing boiler plant currently consists of MHS Stratus boilers which are considered to be at the end of their operational life expectancy. The works shall include the removal of the existing boilers and associated redundant equipment and the installation of new Ideal / Hamworthy Evomax 2 modular boiler systems complete with new frame and header arrangements, plate heat exchangers, controls integration works, flue systems, ancillary equipment, commissioning, testing and handover.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Oct 2026 – Nov 2026 | £150,000 | active |