Works at Cherry Willingham, Lincoln.
New surface water drainage system to rear of 65/67 Waterford Lane along with a new connection to the existing drainage infrastructure on Waterford Lane.
Installation of new pre-cast box culverts and ditch works to Fiskerton Road.
Box culverts pre-ordered by LCC.
Major Constraints: Pre-booked road closures
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| DANIEL CHARLES CONSTRUCTION LIMITED | 05640361 | £47,972,864 | 1 lot Lot 1 | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 | - | active |